[1]
Evan Dwianto Rante Tondok et al. 2025. Risk Prioritization in Road Rehabilitation Projects Using a Schedule-Integrated Matrix Approach. Global Journal of Emerging Science, Engineering & Technology. 3, 2 (Nov. 2025), 74–83. DOI:https://doi.org/10.56225/gjeset.v3i2.71.