(1)
Annisa Eka Liani. Investigating Cost, Quality, and Time Comparisons in Multi-Utility Tunnel Construction at Indonesia’s New Capital City. GJESET 2025, 3 (1), 18-29. https://doi.org/10.56225/gjeset.v3i1.68.